Discover our achievements in the mining sector
Customer :
Superchute – Montreal, QC
Objective :
Provide a winch for a telescopic chute. To contain dust generated by the discharge of bulk materials from a belt conveyor, a telescopic chute is installed at the end of the conveyor. Sensors located at the bottom of the chute send a signal to the winch to maintain an optimal distance between the chute and the bulk material embankment.
Specifications:
Customer :
S. Huot – Quebec City, QC
(Facility: Rio Tinto, Port-Alfred, La Baie, QC)
Objective :
Provide a winch to lift the counterweight that maintains the tension of the bauxite conveyor belt.
Specifications: